The project is about the construction work carried out in Kremasti’s Middle school and High school, concerning the energy upgrade of the existing building and the reduction of the demand load.
According to the manufacturer’s instructions, thermo-insulating aluminum frames, double-glazed energy panels and external thermal insulation composite system were placed with 5cm extruded polystyrene plates Οn a total surface area of 2600 m2 and coating of elastomeric membranes and mineral chip coating of a total surface area of 1800 m2.