  • Afandou Highway Bridge

    PROJECT DESCRIPTION

    The new pre-stretched bridge will be constructed in the same horizontal position as the pre-existing, with a total opening of 99.0 m. The total width of the superstructure carrier has been set at 13.50 m outside the widening area. It consists of two rectangular cross-sections with circular ends and two bends. The foundations of the middle bends are made with six pillars D120m., 14.0 and 17.0 m long respectively, while the ridge bends with five pillars of 10.0m and eight pillars of 12.0 m, respectively. The free height of the vehicles from the National Road will be 5.15 m.