The building was constructed within a plot of total area of 1700 m2, of which 500 m2 is a covered area and 1200 m2 of surrounding space.
The Energy Performance of Buildings Regulation has been implemented and meets all specifications for accessibility for people with disabilities.
The main frame of the building was made of C20/25 concrete reinforced with S500s iron.